Design, document and project manage the construction of new ablutions block, retardant mixing and storage shed and associated civil works.
Structure the project, so it will not impact on fire management operations, as the site is a major remote response and incident management centre.
Our Solution:
Design of prefabricated transportable buildings to minimise the construction time on-site and negate the impact upon day to day operations at the site.
Buildings have the ability to be relocated to other remote DEPI sites as required.
Their Result:
Provide integral infrastructure in a remote location to assist in the fire preparedness and fire fighting within the region.
Increased speed of operations and response time for fire and emergency incidents.